Folly Beach is the one South Carolina beach town where property owners may still build and rebuild seawalls behind the state baseline, so repair here is a real option, under the City of Folly Beach's own seawall ordinance.
866-398-9323Licensed seawall specialists โ FL ยท GA ยท SC
Seawall Repairs by Solid Foundations provides seawall repair in Folly Beach, SC for beachfront homeowners, Folly River and marsh-front owners, and rental property managers. Typical projects include repairing seawalls exposed by erosion on the northeast end, filling voids behind Folly River bulkheads, and restoring grandfathered walls in their original footprint. Call 866-398-9323 or use the quote form to book a free on-site inspection.
Folly's beach rules are different from the rest of the coast for a reason. The Charleston Harbor jetties, finished in 1898, cut off the sand that used to feed the island. A 1987 Army Corps study tied most of Folly's erosion to the jetties, and the state responded by exempting Folly from parts of the Beachfront Management Act. There is no state setback line here. Instead, a baseline was drawn in 1994 along the beachfront rock revetments, and the city's beach plan says nearly the whole shoreline is armored with revetments and groins.
Folly is about four miles southwest of the harbor entrance, and our Charleston seawall repair team runs every Folly project, from permits to crew scheduling. Across the Stono River Inlet, Kiawah Island has none of Folly's exemptions, and on the north side of the harbor, Sullivan's Island is gaining the sand Folly loses. Creek-front owners in Mount Pleasant see the same harbor tides on the other side of the water.
The city's beach management plan spells out the exemption:
The jetties. Sand that once reached Folly now piles up north of the jetties or gets dredged from the shipping channel. The city plan says homes and roads were lost to erosion in the 1940s and '50s.
Sand that doesn't stay. Federal renourishment started in 1993. The 2014 project pumped about 1.5 million cubic yards along 5.3 miles. Between projects, many older walls act as buried backup and only show up when a storm strips the dune.
Tide on both sides. NOAA's Folly River Bridge station records a mean range of 5.27 feet, so walls on the river side work as hard as the ones facing the ocean.
When a wall is standing but sand is washing out from behind it, polyurethane injection fills the voids from the top without digging out the dune. On the Folly River side, timber and concrete walls with failed seams or caps get bulkhead repair through our Charleston team. If a wall is rotating seaward, seawall reinforcement in the Charleston area adds anchors. Rock armor that has slumped or scattered calls for revetment maintenance.
It depends on where the wall sits:
Schedule a free inspection and we'll locate your wall against the baseline before anything else.
Possibly, if it is landward of the 1994 baseline and meets the city's seawall ordinance. Seaward of the baseline, the state controls it.
Not necessarily. Folly's exemption lets damaged walls be rebuilt in the same spot, at the same size, with the same materials.
The city restricts seawall construction during sea turtle season. We plan around those dates when we schedule.
The city plan says most Folly seawalls, outside the northeast end, sit buried under the dune. They show up only when a storm or long-term erosion strips the sand away. ---
In addition to Folly Beach, our licensed seawall repair team serves these nearby South Carolina communities:
Service Area: Folly River and the Atlantic Ocean
We serve all waterfront properties on Folly River and the Atlantic Ocean and surrounding canals, lakes, and waterways.
Seawall Repairs by Solid Foundations also serves these waterfront communities near Folly Beach:
Licensed, insured, NCFI-certified. Serving Florida, Georgia & South Carolina since 1996.
866-398-9323