Call: 866-398-9323 Free Estimate
Licensed Contractor CBC1267322 ยท Florida

Marine Construction in St. Petersburg, FL

Marine construction in St. Petersburg includes new docks, lifts, seawalls, and pilings. Most of it is permitted through Pinellas County Water & Navigation, and waterfront in an aquatic preserve also has to meet state dock limits.

866-398-9323

Get a Free Inspection

Licensed seawall specialists โ€” FL ยท GA ยท SC

Or call directly: 866-398-9323

โœ“ St. Petersburg Expertsโœ“ Licensed CBC1267322โœ“ Free Inspectionsโœ“ 30 Years Experience

Quick Answer

Seawall Repairs by Solid Foundations provides marine construction in St. Petersburg, FL for waterfront homeowners, HOAs, and commercial properties. Typical projects include new docks and lifts on Snell Isle and Venetian Isles canals, replacement seawalls in Shore Acres, and helical-supported pilings on reclaimed fill. Call 866-398-9323 or use the quote form to book a free on-site inspection.

What Can We Build for You in St. Petersburg?

  • Docks: fixed docks, walkways, platforms
  • Boat lifts: new and replacement
  • Seawalls: new construction and full replacement
  • Pilings: including helical foundations
  • Riprap and shoreline armor
  • Demolition of failed docks and walls
Row of new pilings and bulkhead boards along a lake
New pilings set for a waterfront bulkhead.

What Dock Limits Apply in St. Pete's Aquatic Preserves?

Some St. Petersburg shoreline faces Boca Ciega Bay or the Pinellas County Aquatic Preserve, two of the four aquatic preserves in the Tampa Bay region, according to FDEP. Docks there must meet state rule 18-20.019:

RuleLimit
Dock lengthNo more than 500 ft or 25% of the waterbody's width, whichever is less
DeckingBoards no wider than 8 in, spaced at least ยฝ in apart
Height in Resource Protection Areas 1 or 2Main access dock at least 5 ft above mean sea level
Width of a single-family main access dock4 ft in RPA 1 or 2; 6 ft in RPA 3

Source: Fla. Admin. Code R. 18-20.019. Canal lots outside the preserves follow the Pinellas County Water & Navigation Code instead. We confirm which set applies during design.

How Does Permitting Work for St. Petersburg Waterfront Projects?

  • Pinellas County Water & Navigation permits docks, seawalls, riprap, tie poles, and dredge-and-fill countywide, including inside St. Pete. Applications go through the county's Access Portal and are reviewed for environmental, navigational, and construction impacts (Pinellas County).
  • City of St. Petersburg handles building permits and its own zoning rules, such as how close decks and screen enclosures can sit to the seawall.
  • State and federal: Florida DEP and, where applicable, the U.S. Army Corps of Engineers.

How Does a St. Pete Project Run From Start to Finish?

  1. Site visit: frontage, water depth, existing structures
  2. Design: layout sized to your boat and lift, within the rules for your waterway
  3. Survey and sealed engineering
  4. Permits: county, city, and state or federal as needed
  5. Construction, often from a barge on canal lots
  6. Final inspections

Plan the upland side too. If the project includes a new deck or screen enclosure at the dock landing, the city's encroachment rules set how far back from the seawall it must sit: 5 feet for a low uncovered deck, 8 feet for one 12 to 30 inches high, and 10 feet for covered structures. Getting that right in the design avoids a redesign at permit time.

Doing the dock and the wall together often saves money. See bulkhead replacement in St. Petersburg. On reclaimed fill, pilings may need deeper support; see marine foundation repair in St. Petersburg.

How Much Does Marine Construction Cost in St. Petersburg?

Marine construction in St. Petersburg typically costs $400โ€“$800 per linear foot for new dock construction and $250โ€“$600 per linear foot for new seawall or bulkhead construction. Lift size, piling depth, access, and engineering drive the final number.

We also build in Tampa and Bradenton. Our St. Petersburg seawall repair page covers repairs, or contact us to set up a site visit.

Marine Construction FAQs: St. Petersburg

How long can my dock be on Boca Ciega Bay?

Inside the aquatic preserve, no longer than 500 feet or 25% of the waterbody's width at that spot, whichever is less. Other rules may shorten it further.

Who issues dock permits in St. Petersburg, the city or the county?

Pinellas County Water & Navigation permits docks countywide, including in St. Pete. The city may also require a building permit.

Should I replace my Shore Acres seawall before building a new dock?

If the wall is near the end of its life, yes. Building on a failing wall means taking the dock apart later. We'll assess both.

How long does a new dock take to build in St. Petersburg?

Permits usually take longer than construction. Once approved, most home docks and lifts are finished in a few weeks.

Get a Free Inspection

Licensed, insured, NCFI-certified. Serving Florida, Georgia & South Carolina since 1996.

866-398-9323