Call: 866-398-9323 Free Estimate
Licensed Contractor CBC1267322 ยท Florida

Marine Construction in Bradenton, FL

Marine construction in Bradenton covers new docks, lifts, seawalls, and pilings. Inside city limits, docks are capped at 80 feet without a Special Use Permit, need 10-foot side setbacks, and require FDEP approval or exemption before construction.

866-398-9323

Get a Free Inspection

Licensed seawall specialists โ€” FL ยท GA ยท SC

Or call directly: 866-398-9323

โœ“ Bradenton Expertsโœ“ Licensed CBC1267322โœ“ Free Inspectionsโœ“ 30 Years Experience

Quick Answer

Seawall Repairs by Solid Foundations provides marine construction in Bradenton, FL for riverfront and bayfront homeowners, HOAs, and commercial properties. Typical projects include new docks and lifts along the Manatee River and Wares Creek, replacement seawalls on Palma Sola Bay, and helical-supported pilings on soft riverbank soils. Call 866-398-9323 or use the quote form to book a free on-site inspection.

What Do We Build in Bradenton?

  • Docks: fixed docks, walkways, platforms
  • Boat lifts: new and replacement
  • Seawalls: new construction and full replacement
  • Pilings, including helical foundations
  • Riprap and shoreline protection
  • Demolition of failed docks and walls
Pilings being installed near the water with a boat in the background
Piling work next to the water.

How Long Can a Dock Be in the City of Bradenton?

This shapes the design, especially on the Manatee River where deeper water can be a long way out. City staff reports on recent dock requests lay out the rules (City of Bradenton):

RuleWhat it means for you
Maximum dock length (LUR ยง5.1.2.14)80 feet
Longer than 80 feetRequires a Special Use Permit approved by City Council
Side setbacksAt least 10 feet from the extended side property lines
Lot separated from the water by a public road or public landNeeds a special use before any dock is installed (common on Riverside Drive)
State approvalFDEP approval or exemption before construction begins

Unincorporated Manatee County has its own rules. We confirm which apply to your parcel.

How Does Marine Permitting Work in Bradenton?

  • City of Bradenton: building permits through the city's Building and Permitting Division, plus the special-use process for long docks or lots across a public right-of-way.
  • Unincorporated Manatee County: building permits through the county's Building & Development Services.
  • State and federal: Florida DEP and, for work in navigable waters, the U.S. Army Corps of Engineers.

Since many homes with a Bradenton address are actually in unincorporated Manatee County, the first step is always confirming your jurisdiction.

On the Manatee River, water depth is often the deciding design factor. Owners understandably want to reach deeper water for their boat, but every foot past 80 adds a City Council hearing to the timeline. We sound the depth along your frontage during the first visit so you can weigh a shorter dock with a lift against a longer dock that needs special-use approval, before any money goes into engineering.

What Is the Construction Process?

  1. Site visit: frontage, water depth, existing structures, access
  2. Design: a layout that fits your boat and lift within the rules for your parcel
  3. Survey and sealed engineering
  4. Permits: city or county, special use if needed, plus state and federal
  5. Construction, from the water where practical
  6. Final inspections

Building the dock and seawall together often saves money; see bulkhead replacement in Bradenton. On soft riverbank soils, pilings may need deeper support; see marine foundation repair in Bradenton.

How Much Does Marine Construction Cost in Bradenton?

Marine construction in Bradenton typically costs $400โ€“$800 per linear foot for new dock construction and $250โ€“$600 per linear foot for new seawall or bulkhead construction. Lift size, piling depth, access, and engineering drive the final number.

We also build in Sarasota and St. Petersburg. For repairs, see seawall repair in Bradenton, or contact us to set up a site visit.

Marine Construction FAQs: Bradenton

My Riverside Drive lot is across the street from the Manatee River. Can I still build a dock?

Possibly. Inside City of Bradenton limits, a lot separated from the water by a public right-of-way needs a special use approval before any dock is installed. We can guide you through that process.

I need more than 80 feet to reach deep water. What are my options?

In the city, a dock longer than 80 feet requires a Special Use Permit approved by City Council. We design to the shortest length that works and prepare the application if needed.

Does the state have to approve my dock?

Yes. The city requires FDEP approval or an exemption before construction starts, and the Army Corps may be involved in navigable waters.

How long does a new dock take to build?

Permitting usually takes longer than construction. Once approved, most residential docks and lifts are finished in a few weeks.

Get a Free Inspection

Licensed, insured, NCFI-certified. Serving Florida, Georgia & South Carolina since 1996.

866-398-9323