Call: 866-398-9323 Free Estimate
Licensed Contractor CBC1267322 ยท Florida

Marine Construction in Miami, FL

Marine construction in Miami means new docks, boat lifts, seawalls, and pilings. Each one has to fit the City of Miami's dock limits and pass Miami-Dade's Class I review, plus state and federal approval where they apply.

866-398-9323

Get a Free Inspection

Licensed seawall specialists โ€” FL ยท GA ยท SC

Or call directly: 866-398-9323

โœ“ Miami Expertsโœ“ Licensed CBC1267322โœ“ Free Inspectionsโœ“ 30 Years Experience

Quick Answer

Seawall Repairs by Solid Foundations provides marine construction in Miami, FL for waterfront homeowners, condo associations, and commercial owners. Typical projects include new docks and lifts on Biscayne Bay lots in Morningside and Belle Meade, new seawalls on the Miami River, and helical-supported pilings in sandy, porous ground. Call 866-398-9323 or use the quote form to book a free on-site inspection.

What Marine Projects Do We Build in Miami?

  • Docks and walkways, fixed platforms
  • Boat lifts, new and replacement
  • Seawalls and bulkheads, new and full replacement
  • Pilings, including helical foundations
  • Riprap and toe protection
  • Demolition of failed docks and walls
Crew aligning new bulkhead posts along a canal lined with condos
Building a new wall on a residential canal.

How Far Can a Dock Extend in the City of Miami?

This comes first, because it shapes the design. The City of Miami's Miami 21 code sets limits for single-family T3 lots (Miami 21 Article 6):

RuleLimit
Dock or pier into Biscayne Bay35 ft maximum
Dock or pier into other waterways10 ft or 10% of width, whichever is less
Dock/pier setback from abutting property10 ft
Vessel setback from abutting property5 ft
DavitsOver 3-ton capacity prohibited
VesselsPrivate pleasure craft only

Other zones and neighboring municipalities have their own rules. We confirm which apply to your address during the site visit.

How Does Permitting Work for Miami Marine Projects?

  • Miami-Dade Class I: required for work in, on, or over tidal waters, reviewed by the county's environmental resources division (DERM). Unavoidable impacts need mitigation.
  • City of Miami: zoning and building permits.
  • State and federal: Florida DEP for submerged lands, and the U.S. Army Corps of Engineers where navigable waters are involved.
  • In-water conditions: the county applies standard manatee construction conditions during in-water work.

Seawall position also matters. Standard county processing applies when a new wall stays within one foot of the old wet face; bigger shifts can go before the County Commission. Timing differs a lot from job to job, and it tends to stretch after a storm season when every agency is busy. We give you a realistic schedule at the start and keep you updated as each approval comes in, so you know when crews and materials will arrive. If you just need rock at the base of an existing wall, our riprap installation in Miami page explains the lighter permit paths.

What Does the Build Process Look Like?

  1. Site visit: measure frontage, waterway width, depth, and existing structures.
  2. Design: a layout that fits the dock limits, your boat, and your lift.
  3. Engineering and survey: signed and sealed plans.
  4. Permits: county, city, and state or federal as needed.
  5. Construction: often from a barge on bay lots to protect your yard.
  6. Final inspections and close-out.

Combining a dock with seawall work saves money because crews and permits overlap. See bulkhead replacement in Miami.

How Much Does Marine Construction Cost in Miami?

Marine construction in Miami typically costs $400โ€“$800 per linear foot for new dock construction and $250โ€“$600 per linear foot for new seawall or bulkhead construction. Lift size, piling depth, access, and engineering all affect the total.

Porous ground can mean deeper support for pilings; see marine foundation repair in Miami. We also build in Fort Lauderdale and Key West. Ready to plan? Contact us to set up a site visit.

Marine Construction FAQs: Miami

How far can my dock go into Biscayne Bay?

On single-family T3 lots in the City of Miami, docks and piers into Biscayne Bay are limited to 35 feet. On other waterways, the limit is 10 feet or 10% of the width, whichever is less.

Can I install a large davit on my Miami dock?

Miami 21 prohibits davits over 3-ton capacity on T3 residential lots. A boat lift is usually the better option for larger boats.

Who issues the permits for a new dock?

Usually several agencies: Miami-Dade's Class I permit, City of Miami zoning and building permits, and state or federal approval where required. We coordinate all of them.

How long does a new Miami dock take?

Permitting usually takes longer than building. Once approvals are issued, most residential docks and lifts are finished within weeks.

Get a Free Inspection

Licensed, insured, NCFI-certified. Serving Florida, Georgia & South Carolina since 1996.

866-398-9323