Call: 866-398-9323 Free Estimate
Licensed Contractor CBC1267322 ยท Florida

Marine Construction in Naples, FL

Marine construction in Naples covers new docks, boat lifts, seawalls, and piling work. Every project has to fit Collier County's dock size and setback rules and go through City of Naples or county marine permitting.

866-398-9323

Get a Free Inspection

Licensed seawall specialists โ€” FL ยท GA ยท SC

Or call directly: 866-398-9323

โœ“ Naples Expertsโœ“ Licensed CBC1267322โœ“ Free Inspectionsโœ“ 30 Years Experience

Quick Answer

Seawall Repairs by Solid Foundations provides marine construction in Naples, FL for waterfront homeowners, HOAs, and commercial properties. Typical projects include new docks and boat lifts on Port Royal and Aqualane Shores canals, new seawalls with required riprap on Naples Bay, and pilings on helical foundations. Call 866-398-9323 or use the quote form to book a free on-site inspection.

What Marine Projects Do We Build in Naples?

  • Docks: fixed docks, walkways, and platforms
  • Boat lifts: installation and replacement, including canopies
  • Seawalls and bulkheads: new construction and full replacement
  • Pilings: new and replacement, including helical foundations
  • Riprap and shoreline protection
  • Marine demolition: removing failed docks and walls
Crew aligning new bulkhead posts along a canal lined with condos
Building a new wall on a residential canal.

How Big Can My Dock Be in Collier County?

This is the first question to settle, because it shapes the whole design. Under Collier County LDC ยง5.03.06:

RuleLimit
Protrusion into waterways 100+ ft wideGenerally 20 ft max (dock + boat)
Protrusion into waterways under 100 ft25% of width or 20 ft, whichever is less
Side setback, 60+ ft of frontage15 ft from the side lot line
Side setback, under 60 ft of frontage7.5 ft
Boat-lift canopiesMax 35 ft long, 12 ft high; beige or mid-range blue/green; 1 per site on canals, 2 on bays

Anything beyond these limits needs a boat dock extension, which is a separate public-hearing process. We design inside the rules first, so your permit moves faster.

How Does Marine Permitting Work in Naples?

  • Inside City of Naples limits: a marine permit through the city's building department, with signed and sealed plans. A final survey is required for seawalls before the Certificate of Completion.
  • Unincorporated Collier County: the county's PRMAR marine permit covers docks, seawalls, boat lifts, and marine demolition.
  • State and federal: Florida DEP and, where applicable, the U.S. Army Corps of Engineers for work in state or navigable waters.

Contractors working over navigable water in the city must also carry Longshore insurance. Ask any contractor you're considering for proof.

What Is the Marine Construction Process?

  1. Site visit: measure frontage, waterway width, water depth, and existing structures.
  2. Design: layout that fits the county's protrusion and setback rules, your boat, and your lift.
  3. Engineering and survey: signed and sealed plans.
  4. Permits: city or county, plus state/federal when required.
  5. Build: often from a barge on canal lots to keep equipment off your yard.
  6. Final inspection and survey.

Dock and lift jobs are often combined with Naples seawall work. It's cheaper to do both while crews and permits are already in place. See bulkhead replacement in Naples. On natural waterways in the city, new seawalls also need riprap installation.

How Much Does Marine Construction Cost in Naples?

Marine construction in Naples typically costs $400โ€“$800 per linear foot for new dock construction and $250โ€“$600 per linear foot for new seawall or bulkhead construction. Lift size, piling depth, water access, and engineering all affect the final price.

Where soil is soft, pilings may need deeper support. See marine foundation repair in Naples. We also build in Marco Island and Fort Myers. Ready to start? Contact us for a site visit.

Marine Construction FAQs: Naples

How far can my dock stick out into a Naples canal?

On waterways 100 feet or wider, generally 20 feet, including the boat. On narrower waterways, 25% of the width or 20 feet, whichever is less. Going beyond that requires a boat dock extension approval.

Can I put a canopy on my boat lift in Naples?

Usually, yes, within Collier County limits on size, height, and color, and not if the property already has a boathouse or other covered structure.

Should I replace my seawall before building a new dock?

If the wall is near the end of its life, yes. Building a new dock on a failing wall means tearing it out again later. We'll assess both.

How long does it take to build a dock in Naples?

Permitting usually takes longer than construction. Once permits are issued, most residential docks and lifts are built in a matter of weeks.

Get a Free Inspection

Licensed, insured, NCFI-certified. Serving Florida, Georgia & South Carolina since 1996.

866-398-9323